This Is How You Stop an Old Train Tunnel From Flooding

The Albula Tunnel, the second longest on the Glacier Express line that cuts through the Swiss Alps, was opened in 1903. As a result, it's badly in need of renovation - and engineers have an ambitious solution. (3:28)

Tags

Latest Videos

Preview thumbnail for video'Richard Branson Speaks on Plan for Space Tourism
Richard Branson Speaks on Plan for Space Tourism (2:45)
Preview thumbnail for video'This Is How MINI JCW Turbo Engines Are Built
This Is How MINI JCW Turbo Engines Are Built (2:17)
Preview thumbnail for video'Here's How a Turbo-Charged Porsche 911 Engine is Built
Here's How a Turbo-Charged Porsche 911 Engine is Built (2:42)
Preview thumbnail for video'How Engineers Remove Unwanted Sounds from Camaros
How Engineers Remove Unwanted Sounds from Camaros (2:15)
Preview thumbnail for video'This Car Factory Assembles Camaros Every 35 Minutes
This Car Factory Assembles Camaros Every 35 Minutes (2:05)
Preview thumbnail for video'Why Jaguar Uses Aerospace Aluminum to Build Its Cars
Why Jaguar Uses Aerospace Aluminum to Build Its Cars (3:09)
Preview thumbnail for video'This Inventor Made the Famed D-Day Swimming Tanks
This Inventor Made the Famed D-Day Swimming Tanks (2:47)
Preview thumbnail for video'Only 18 Alfa Romeo 4Cs Are Created Per Day. Here's Why.
Only 18 Alfa Romeo 4Cs Are Created Per Day. Here's Why. (1:57)
Preview thumbnail for video'Why Building a Carbon Fiber Car Is So Labor-Intensive
Why Building a Carbon Fiber Car Is So Labor-Intensive (2:38)